Another huge success for our crack engineering team by commissioning a new 4 x 5 m movable pool floor system, equipped with underwater treadmill, in the aquatic rehabilitation department of Quiron in Madrid Spain. Thanks also to our Spanish distributor PRIM technical team for their faithful support. A job very well done!